Skip to content
DELEVEL Request a quote

Home › Inspection and lead times

Inspection and lead times

Every order is inspected before it ships. The proportion inspected is set by order quantity, and it is published rather than described.

Orders up to 10 pieces
100%
Orders of 20 to 50 pieces
50%
Orders of 60 to 100 pieces
30%

Standard catalogue items are inspected on receipt into stock.

Inspection reports

Report
Standard catalogue itemsOn request
Non-standard and made-to-drawing toolingIncluded, against the approved drawing
Custom drills and deep-hole through-coolant drillsIncluded
PCD toolingIncluded

Lead times

Working days
Stock itemsWithin 5
Custom and non-standard15 to 30, confirmed in writing at the time of order

Drawing approval

StageWhat happens
1. SpecificationMaterial, hardness, tolerance, coating and geometry confirmed in writing
2. Drawing issuedWe send a drawing of the tool as it will be made
3. Your approvalProduction does not start until you sign off
4. InspectionFinished tools measured against the approved drawing

Coatings

  • TiAlN
  • AlTiN
  • TiSiN
  • AlCrN
  • TiCN
  • TiN
  • DLC
  • Uncoated

Coating is selected for the workpiece material rather than applied by default. All catalogue shanks are metric; inch shank diameters are quoted to order, and inch thread pitch is standard on the 60° range thread mill series.

Need a report format to match your incoming inspection?

Tell us which characteristics you record and we will report against them.

Send a drawing