Home › Inspection and lead times
Inspection and lead times
Every order is inspected before it ships. The proportion inspected is set by order quantity, and it is published rather than described.
- Orders up to 10 pieces
- 100%
- Orders of 20 to 50 pieces
- 50%
- Orders of 60 to 100 pieces
- 30%
Standard catalogue items are inspected on receipt into stock.
Inspection reports
| Report | |
|---|---|
| Standard catalogue items | On request |
| Non-standard and made-to-drawing tooling | Included, against the approved drawing |
| Custom drills and deep-hole through-coolant drills | Included |
| PCD tooling | Included |
Lead times
| Working days | |
|---|---|
| Stock items | Within 5 |
| Custom and non-standard | 15 to 30, confirmed in writing at the time of order |
Drawing approval
| Stage | What happens |
|---|---|
| 1. Specification | Material, hardness, tolerance, coating and geometry confirmed in writing |
| 2. Drawing issued | We send a drawing of the tool as it will be made |
| 3. Your approval | Production does not start until you sign off |
| 4. Inspection | Finished tools measured against the approved drawing |
Coatings
- TiAlN
- AlTiN
- TiSiN
- AlCrN
- TiCN
- TiN
- DLC
- Uncoated
Coating is selected for the workpiece material rather than applied by default. All catalogue shanks are metric; inch shank diameters are quoted to order, and inch thread pitch is standard on the 60° range thread mill series.
Need a report format to match your incoming inspection?
Tell us which characteristics you record and we will report against them.